tunnel

tunnel

Curved 5-ring brick arch Victorian tunnel comprising Zone 3 of the test track.

The tunnel dates back to 1850 and, as such, presents a mixture of environmental conditions including dry areas, wet areas and areas that have a build-up of mineral deposits.

Features

  • 870m (L) x 8m (W) x 5.6m (H)
  • Curved 5-ring brick arch Victorian tunnel
  • W12 gauge
  • Comprises Zone 3 of test track
  • Emergency lighting system
  • Leaky feeder antenna
  • Power outlets at regular intervals
  • Mix of environmental conditions
  • Space to construct a parallel second test track

Uses

  • Vehicle performance testing
  • Track, infrastructure & lineside monitoring, maintenance & repair
  • Track, infrastructure & lineside equipment & systems testing
  • Environmental monitoring & control
  • Training location
  • Filming location

Facilities for Hire

Engineering Hall

Rail Test Loop

Platforms

Mule Vehicle 1

Shunter

Workshop

Tunnel

Rapid Charger

Mule Vehicle 2

Lifting Jacks

Rail Test Track

Siding

Mobility Hub

Alumicart

STAY INFORMED

SIGN UP TO BCIMO NEWS

BCIMO is a not-for-profit Research and Technology Organisation (RTO) and operator of the Very Light Rail National Innovation Centre (VLRNIC), a unique, world-class centre for rail innovation based in Dudley in the West Midlands.

BCIMO Project Funders

Google Map Location: BCIMO
what3words Address: ///shades.glue.tile

Postal Address: BCIMO, Very Light Rail National Innovation Centre, Zoological Drive, Dudley. DY1 4AW
Email:
 info@bcimo.co.uk
Phone:
07769 586893